Double Arms 30W-100W Solar Street Lights
Product Specification
4.0KWH Design, Lighting Time: 11-12 Hours/Nights*3-5 Overcast Weather
Pole height |
6M |
6M |
8M |
8M |
LED Lamps |
20W |
30W |
45W |
60W |
Solar Panel |
110W*1PC |
80W*2PC |
120W*2PC |
150W*2PC |
Solar Battery |
100Ah/12V*1PC |
150Ah/12V*1PC |
120Ah/12V*2PC |
150Ah/12V*2PC |
Battery Box(Optional) |
Engineering Steel |
Engineering Steel |
Engineering Steel |
Engineering Steel |
Battery Box(Optional) |
Engineering Plastic |
Engineering Plastic |
Engineering Plastic |
Engineering Plastic |
Solar Controller |
10A/12V |
15A/12V |
10A/24V |
15A/24V |
Packing:40'HQ |
150 Units |
130 Units |
100 Units |
90 Units |
5.0KWH Design, Lighting Time: 11-12 Hours/Nights*3-5 Overcast Weather
Pole height |
6M |
6M |
8M |
8M |
LED Lamps |
20W |
30W |
45W |
60W |
Solar Panel |
90W*1PC |
65W*2PC |
90W*2PC |
120W*2PC |
Solar Battery |
100Ah/12V*1PC |
150Ah/12V*1PC |
120Ah/12V*2PC |
150Ah/12V*2PC |
Battery Box(Optional) |
Engineering Steel |
Engineering Steel |
Engineering Steel |
Engineering Steel |
Battery Box(Optional) |
Engineering Plastic |
Engineering Plastic |
Engineering Plastic |
Engineering Plastic |
Solar Controller |
10A/12V |
15A/12V |
10A/24V |
10A/24V |
Packing:40'HQ |
150 Units |
130 Units |
100 Units |
90 Units |
Different Solar Street Light Battery Box Design For Choosing
Advantage Of Solar Street Lighting Syatem
* Green Energy,Low Power Consumptiom,Save 60%~80% Than Others.
* Higher Power,Higher Brightness Intensity,Good Color Rendition.
* Save Electricity Cost,Save Electric Transformer And Cable Cost,Free Maintanenance.
* Environmental Impact---Eliminate Hazardous Disposal,Low Light Pollution,No Radiation.
* Longer Lifetime: Between 80000-100000 Hrs,If Lighting 12Hrs/Night Could Use At Least 12-22 Years.
* Less Heat Generated Compared To Other Sourses.
* Downward Orientation Of Light Could Adjust Lighting Angles And Lighting Range And Shape On The Ground To Meet The Road-rectangular,Other Lighting Source Just Could Give Common Round Shape And Small Lighting Range.
Payment & Delivery
Payment Terms |
T/T(perfered)
|
EXW |
30% In Advance, 70% Balance Paid Before Delivery |
FOB |
CFR/C&F |
30% In Advance, 70% Against Copy Of B/L |
CIF |
L/C |
Total Amount Above USD100,000, We Accept L/C At Sight |
West Union |
Total Amount Less Than USD1,000 |
PayPal |
Delivery Time |
15-20 Working Days After Receiving Down Payment For One Container. |